Guide to the complete use of the builder calculator
Estimated usage of tiles/floor and wall coating. Pages on: tiles/floor switchTab('tile')(room space) #roomAreaArea, single area #tileSizeRate of loss #tileLoss% of paint switchTab('paint')(Long wide high) #roomL/#roomW/#roomHZone of doors and windows #doorArea)。 Point "calculating the actual amount of use"#btnCalc Writing #resultBox/#resGrid。 (a) Cricket is multiplied by a single area of tectonic area (1+ depletion); The paints are covered by a wall spread with a reduction of the size of the doors and windows combined with the coverage logic (based on the page script). It is not a construction graphic volume software that is suitable for pre-renovation procurement.
How do you fill the parameters?
- (a) Area of net land use; An alien room can be broken into rectangles and filled in.
- (a) Single area units corresponding to room size (common m2); The packing specifications are translated by reference to the instructions.
- Losses: The vertical lay is about 5%-8%, the slopes/complex platters can be 10%+, as recommended by the field master.
- Painting: Wide and high-pressure walls, with windows and doors deducted from the walls to avoid additional purchases.
- Toggles the page sign to hide another group of inputs and emptys the results for display.
Recommended process
- The size of the room is either large or large, and the window and the door are written down about a little.
- Select tiles or coating pages to fill in parameters and wear and tear.
- The number of cells/litres of the results is recommended after calculation, and the procurement is taken upwards.
- The same number reserved a small number of items to avoid the batch colour difference.
- The final orders are reviewed with the Chief/Designer and the complex configuration is added.
Border
- No additional details such as kick-lines, wave-guides, sutures, etc. (unless the result area is separate).
- Only area estimation is done without processing the yin-angular process and the separation map.
- The size of the paint, the ratio of the paint to the base is based on the product description and the page is a simplified model.
- Not related to the loan/rent gain instrument, this page is only for material quantities.
FAQ
Turns to 0 or not to show?
Check if the numbers are complete and NAN is not available; Area and single plate > 0.
How much is the loss?
Inexperienced 8%-10% conservative; Master has a row plan to adjust.
Wood floor or box?
The area and loss are calculated first, and the boxes are taken upwards by the number of boxes in the packagem2/box.
Procurement tips
Reduction in colour differentials in the same procurement batch; Leave 1-2 boxes for repair. Water-protected areas, balconyes and indoor materials may differ in specifications and be counted separately. This tool helped to establish the order of magnitude, and the list of contracts remains based on the actual field measurements and the commercial offer. Calculates that are done locally in the browser without uploading the family pattern.
Loss and removal
The calculation is done upwards to the packing specifications, and the amount of the piece/bunk is not enough. Slashed, laminated floors are more expensive. The paint is covered by the number and base paint, and the page results are the starting point of the size method.
The house is a habit.
Multiple measurements of averages; The balcony kitchen is in separate notes. Door and window deductions are not missing. The result is procurement communication only, and contracts are subject to on-site review. Toggle the marking of tiles/paint pages and refill the calculations.
Supplementary note 1
Please combine the actual buttons with the input box operation on this page: finish the main process and read the boundary description. The content is consistent with the current tool function and does not apply the template across the page. The results are based on the real-time output of the interface; Further manual review of official business is requested. Local processing is done with the privacy of public computers and can close pages after the use. If word validation is required to achieve the standard in a stable manner, this paragraph is used to complete the readable description without changing the functional description.